Bathroom remodeling project

Seattle, Bellevue, Kirkland

Bathroom Remodeling

Bathroom and shower remodeling, walk-in showers and bathtub-to-shower conversions. Discuss your project with Busy Bee and request a free estimate.

Get a free estimate

What’s included

The part you can't see matters most.

Most failed bathrooms fail behind the tile. We use bonded sheet membranes, pre-sloped pans and flood-test every shower for 24 hours before the first tile goes on.

Included at no extra cost
Flood test documentation, niche layout drawings, dust containment and a workmanship warranty in writing.
01

Design & layout

Fixture plan, tile layout drawings and niche placement mapped to the stud bays.
02

Demo to studs

Old pan, backer and rotten framing removed and replaced, not covered over.
03

Waterproofing

Bonded sheet membrane, pre-sloped pan, 24-hour flood test with photo record.
04

Tile & stone

Full-height walls, mitered outside corners, grout joints laid out to land clean.
05

Heat & venting

Electric floor heat on a programmable thermostat, fan ducted fully outside.
06

Fixtures & glass

Vanity, trim, mirrors and custom frameless glass measured after tile.

Recent work

Curbless primaries, guest baths and basement additions.

Curbless primaryCurbless primary
Guest bathGuest bath
Wet roomWet room

Materials & specs

What we spec by default.

Every line below is written into the bid. No allowances that quietly grow after demo day.

WaterproofingBonded sheet membrane system, full showerSTANDARD
Shower panPre-sloped foam, linear or center drainSELECTABLE
Floor heatElectric mat with programmable thermostatSTANDARD
VentilationLow-sone ceiling fan, ducted to exteriorSTANDARD
Glass3/8" frameless, measured after tile is setSELECTABLE

Investment

Three ways to build it.

Every bathroom lands on a fixed bid after the site visit. These are the three scopes most clients choose between.

Guest bath

Fixed bid after site visitSame footprint, tub-shower combo.Waterproofed tub surroundNew vanity & trimTile floor, heatedFan, lighting, paintStart here

Primary

Fixed bid after site visitWalk-in shower and double vanity.Curbless or low-curb showerFrameless glassDouble vanity, stone topFull-height wall tileStart here

Wet room

Fixed bid after site visitShower and tub in one sealed room.Full-room waterproofingFreestanding soaking tubLinear drain, stone slab wallsSteam-ready optionStart here

Good questions

The things people ask on the first call.

Still unsure? Send a note below and we’ll talk it through on the first call.

Usually yes on a joist floor. We sister and drop the framing. On a slab it depends on drain depth, and we'll tell you at the site visit.

Next step

Let's look at your bathroom.

Tell us how to reach you. We’ll call within one business day to discuss your project and next steps.

Project: Bathroom remodeling
Project type
Add details (optional)

No sales visit fee. We use your details to respond to your request. Privacy Policy

Call